PGA Waste Water Treatment Plant Filter Feed Pond Bypass

Seacoast’s award winning PGA Regional Water Reclamation facility incorporates the latest in pollution control and water recycling technology. This 12.0 million gallons per day state of the art treatment plant features a range of physical, biological, chemical and odor control processes operated around the clock. Hinterland Group is well under construction on the current upgrades to the Filter Pond Bypass, allowing the Utility to increase their capacity for backwash filter reservoirs within the plant. Several hundred feet of large diameter pressurized force main have been installed throughout the existing plant infrastructure. Our experienced crews most recently completed a section of pipe install which had multiple existing duct banks and utility conflicts quickly and without any incident. Kudos to team Hinterland for another job well done!