20-0162-00 Hallandale Raw Water 12” Installation

This ongoing project is for the construction and installation of approximately 3,000 LF of new 12” raw water pipeline in the NW 11th Avenue, and NW 8th Street Right-of-Ways in the City of Hallandale Beach, Florida. The pipe runs from Production Well No. 9 to an interconnection with the existing 12” raw water pipeline at Production Well No. 8 (PW-8) with associated fittings, valves, and pavement restoration within roadway limits. The work also includes the construction of approximately 565 LF of new 8” gravity sewer pipe within Ansin Boulevard, which will replace an existing section of gravity sewer piping. The project is currently running on schedule and within budget.

Project Gallery