Your One- Stop Shop for all Infrastructure Needs
NFPA 2026 — LAS VEGAS, NV — BOOTH 1931
YOUR FIRE LOOP
CAN’T AFFORD
TO FAIL.
Most industrial fire loops haven’t been inspected since installation.The average failing water main is now 53 years old — underground, it remains unseen until catastrophic failure makes it impossible to ignore. Hinterland Group rehabilitates aging fire infrastructure without shutting your facility down. From condition assessment to full rehabilitation, Hinterland Group’s pipeline experts build a custom program around your fire suppression infrastructure — one contractor, every solution.

AVERAGE AGE OF FAILING WATER MAINS (YEARS)
OF CAST IRON PIPE IN SERVICE IS 50+ YEARS OLD
LINEAR FEET REHABILITATED BY HINTERLAND
EMERGENCY RESPONSE — ALWAYS READY
FIRE LOOP & UNDERGROUND INFRASTRUCTURE SOLUTIONS
Four core capabilities — from first look to full replacement — designed for industrial and municipal clients who need answers without shutting down operations.

01 CCTV INSPECTION & ASSESSMENT
Most fire loops have never been opened. CCTV inspection changes that. High-definition camera technology reveals exactly what’s inside — corrosion, joint failures, tuberculation, blockages, leaks — and delivers a documented condition report ranked by urgency and risk. That report becomes the blueprint for everything that follows
02 CIPP LINING
Structural rehabilitation from the inside out. Minimal excavation. No interruption to fire suppression coverage. Hinterland deploys temporary bypass systems to keep your fire loop active and NFPA-compliant throughout the entire rehabilitation process. CIPP restores flow capacity and pressure integrity to aging fire mains with a 50+ year life extension. Pressure lining works with every host pipe material, so your existing infrastructure is never a barrier.

03 PIPE BURSTING
Pipe bursting replaces your deteriorated fire main — or upsizes it for greater flow capacity — without open trenching. The host pipe is fractured outward as new pipe is simultaneously pulled into position. Temporary bypass keeps fire suppression active and NFPA-compliant from mobilization through completion. No trench. No downtime. No compromise on coverage.

04 OPEN CUT / DIG & REPLACE
When full replacement is the right call, Hinterland delivers. Our crews manage complete open-cut pipeline replacement — from mobilization and excavation through installation and site restoration — with the same precision and safety standards as our trenchless work.
THE RISK IS REAL
AGING FIRE LOOPS ARE A COMPLIANCE AND LIABILITY PROBLEM
WE DON’T JUST INSTALL IT. WE MANUFACTURE IT.
Built by Contractors, for Contractors.

Dry & Wet-Out
CIPP Liner
Engineered to exceed ASTM requirements in every diameter and configuration.
Pure Calcium Aluminate
REFRATTA HAC100
The toughest corrosion protection available for wastewater infrastructure.
Proactive Infrastructure Management
The PRIME Maintenance Plan
P
Pipeline Rehabilitation Services
Trenchless rehabilitation from assessment to installation
R
Repair & Replacement of Lift Stations, Gravity Mains & Service Laterals
Full lift station and pipeline repair and replacement
I
Inspection Services
CCTV, laser profiling, and sonar condition assessment
M
Maintenance Services
Proactive care that prevents costly emergency failures
E
Evaluation & Assessment Services
Risk assessment, system analysis, and long-term planning
